Junction Street, Seddon
This project was a renovation / extension in Seddon, Melbourne.
Features: Miglas Windows | Designed by Altereco | Open plan kitchen and dining | Imported Ceramic Tiles | Floor to ceiling tiles
Project duration: 6 months
Crisp Ave, Brunswick
This project was a renovation / extension in the heart of Brunswick.
Features: 4 bedrooms | 2 bathrooms | Open plan kitchen and dining | Stacker doors to outdoor entertaining area | Interiors by Studio Amble
Project duration: 10 months
Botanica Drive, 2023
This project was a new custom built brick/render double story home.
Features: 4 bedrooms | Theatre Room | 3 bathrooms | 1 Powder Room | Open plan kitchen and dining | Bifold doors to outdoor entertaining area | Floor to ceiling tiles | Double glazed Windows
Project duration: 10 months
Yvonne, 2021
This project was a new modern weatherboard, double story, free standing townhouse.
Features: Open plan kitchen and dining | Bifold doors to outdoor entertaining area | 3 bedrooms | 2.5 bathrooms | Gas fireplace | Floor to ceiling tiles | Trex Decking | Cement Sheet weatherboards | New driveway
Project duration: 7 months
Smith Street, 2022
This project was a new custom built dual occupancy dwelling.
Features: 2 bedrooms per unit | Partiwall designed building | Integrated Storage areas | Solar panels and heat pumps to acheive a 7-star energy rating
Project duration: 12 months
Yvonne, 2019
Extension: New Master & Ensuite | New Double Car Garage | New Deck and Alfresco | New cross over and exposed aggregate driveway
Renovation: Main bathroom | Kitchen | Lounge Room | Laundry | Landscaping | Picket Fence
Aintree, 2017
This project was a new modern brick/render, double story, free standing townhouse.
Features: Open plan kitchen and dining | Bifold doors to outdoor entertaining area | 4 bedrooms | 2.5 bathrooms | Floor to ceiling tiles | New driveway
Project duration: 12 months
Aintree, 2015
This project was a renovation.
Features: New Windows | New Kitchen | Whitewash timber floorboards | New Ensuite and Bathroom | New Deck, Pergola and Carport
Project duration: 10 months